Remedial & Class 2

Complex buildings.
Controlled delivery.

LP works with strata managers, owners corporations, consultants and property stakeholders on technically difficult rectification and regulated residential building work.

Sydney residential rectification project enclosed in shrink wrap

Engineered to keep working through the weather.

This consultant-led rectification demonstrates the temporary works, weather protection, access planning and technical coordination LP brings to substantial remedial construction.

01 / Class 2 remedial deliveryGovernance · compliance · delivery

A controlled pathway for Class 2 remedial work.

Class 2 remedial work requires clear responsibility, coordinated design and disciplined construction delivery from the outset.

LP coordinates the regulated building work pathway from defect assessment and consultant design through approvals, temporary protection, staged rectification, inspections, construction evidence and handover. Each stage is planned around the building, its occupants and the compliance requirements governing the work.

02 / Technical deliveryConsultant-led rectification
01

Defect rectification

Substantial demolition and reconstruction, including defective balconies, waterproofing systems and associated building elements.

02

Protected staging

Engineered temporary roofs, hoarding, scaffold enclosures, shrink wrap and material movement planned around building access and exposure.

03

Consultant coordination

One accountable construction interface across the client, superintendent, architect, engineers, specialist consultants and certifier.

03 / Broader capabilityAssessment · response · restoration

Capability across complex property.

From the first assessment through to reinstatement, LP coordinates the people, protection and construction response needed to move complex property work forward.

01

Residential & Strata Claims

Management of residential, commercial and strata claims from initial lodgement through to completion.

02

Emergency Make Safe

Rapid temporary protection, including tarping, boarding and stabilisation to secure the property.

03

Major Loss & Complex Remedial

End-to-end management of large-scale claims, complex restoration and substantial remedial works.

04

Project & Community Management

Careful programme, budget and stakeholder control with minimal disruption to occupied environments.

05

Defect Inspections & Assessments

Detailed condition assessment to identify defects, establish root causes and prioritise rectification.

06

Water Damage Restoration

Leak detection, water extraction, drying, dehumidification and complete repair of damaged areas.

07

Façade Restoration

Remediation of façades, render, brickwork and cladding systems to restore performance and appearance.

08

Fire & Smoke Damage

Coordinated fire and smoke restoration, odour removal and building reinstatement.

09

Storm Damage Repairs

Roof and structural repairs, including replacement of damaged building elements.

10

Impact Damage Repairs

Repair of property damage caused by vehicles, fallen trees and other impact events.

04 / Delivery in practiceTemporary works · access · rectification
Class 2 Residential Building Work

Regulated work.
Clear accountability.

LP’s Class 2 delivery model brings consultant coordination, compliance and construction quality into one controlled pathway.

A successful Class 2 outcome starts before work begins. LP aligns the scope, design responsibilities, approvals and evidence requirements early, then carries that structure through procurement, construction, inspections and handover.

01

Define

Confirm the scope, regulated building work, design responsibilities and consultant inputs.

02

Coordinate

Align design practitioners, engineers, certifiers, strata stakeholders and specialist trades.

03

Deliver

Control procurement, sequencing, inspections, variations and construction evidence.

04

Close Out

Complete documentation, commissioning, defects and handover through a clear compliance pathway.

A stronger delivery partner for complex property.

Technical coordination, clear reporting and the construction capability to carry the solution through.

Discuss Remedial or Class 2 Work →